| Category |
Albums |
Files |
| Residential HVACWork portfolio of residential heating & air conditioning installs |
|
6 |
92 |

|
|
2 |
17 |

|
| Commercial HVAC/RWork portfolio of commercial heating, air conditioning and refrigeration installs |
|
|
| 109 files in 8 albums and 4 categories with 0 comments viewed 11100 times |

View of of new Trane Air Handler. Attic System
|
|

New Trane Variable speed air handler with new return and supply duct drops. Yet another view.. This system typically comes with a 10 year function part warranty, and a 5 year labor warranty. Customer is very happy with the new system. She could not believe the difference both in her comfort level or her energy bills.
|
|

Here is a close up of the new Carrier Performance heat pump, sitting on a reinforced polyethylene pad and 4- 6" pump ups.
|
|

View of the 2 new Trane condensing units. The unit on the left is for the AC, and is responsible for the cooling load for the basement and 1st floor. The unit on the right is a Heat Pump, and is responsible for cooling and heating the 2nd floor.
|
|

And yet another view
|
|

Yet another view of the new Carrier Infinity gas furnace being installed
|
|

One of our up and coming stars, by his handy work!
|
|

Here is a picture of the Carrier Infinity Air Cleaner.. This thing is amazing, so good it can kill mold & bacteria.
|
|

And yet another picture of the newly installed Trane Xl16i Heat Pump (Condensing Unit).Aug 24, 2007
|
|

Yet another picture of the newly installed Trane Xl16i Heat Pump (Condensing Unit).Aug 24, 2007
|
|

Anther picture of the completed installation of the new Trane air handler, and Trane Clean Effects air cleaner.Aug 24, 2007
|
|

New supply duct. Aug 24, 2007
|
|

Completed installation of the new Trane air handler, and Trane Clean Effects air cleaner (to the left of the air handler. We also installed an electronic water switch, for the ultimate in flood prevention.Aug 24, 2007
|
|

"JB" up in the attic fighting with the supply ductwork getting it just perfect.Aug 24, 2007
|
|

Yet another picture of the Air handler being installed in the newly formed and fitted ductwork with refrigerant lines connected.Aug 24, 2007
|
|

Lead tech. Mike installing new high voltage electrical system.Aug 24, 2007
|
|