
And yet another picture of the newly installed Trane Xl16i Heat Pump (Condensing Unit).Aug 24, 2007
|
|

Yet another picture of the newly installed Trane Xl16i Heat Pump (Condensing Unit).Aug 24, 2007
|
|

Anther picture of the completed installation of the new Trane air handler, and Trane Clean Effects air cleaner.Aug 24, 2007
|
|

New supply duct. Aug 24, 2007
|
|

Completed installation of the new Trane air handler, and Trane Clean Effects air cleaner (to the left of the air handler. We also installed an electronic water switch, for the ultimate in flood prevention.Aug 24, 2007
|
|

"JB" up in the attic fighting with the supply ductwork getting it just perfect.Aug 24, 2007
|
|

Yet another picture of the Air handler being installed in the newly formed and fitted ductwork with refrigerant lines connected.Aug 24, 2007
|
|

Lead tech. Mike installing new high voltage electrical system.Aug 24, 2007
|
|

Yet another picture of the Air handler being installed in the newly formed and fitted ductwork.Aug 24, 2007
|
|

Air handler being installed in the newly formed and fitted ductwork.Aug 24, 2007
|
|

Yet another picture of the newly installed Trane Xl16i Heat Pump (Condensing Unit). with the new refrigerant lines, electrical and wiring.Aug 24, 2007
|
|

Picture of the newly installed Trane Xl16i Heat Pump (Condensing Unit).Aug 24, 2007
|
|
| 109 files on 10 page(s) |
 |
1 |  |
 |
 |
 |
 |
 |
 |
 |
 |
|